Bothell City Council was scheduled to weigh 2026-2030 stormwater master plan
Staff sought feedback on the proposed 2026-2030 Storm and Surface Water Master Plan at the Sept. 9, 2025 study session, with adoption planned for October 2025 1.
What the records say
In materials published ahead of the Sept. 9, 2025 City Council study session, staff sought feedback on the proposed 2026-2030 Storm and Surface Water Master Plan 1. The record said no action was requested at that meeting; the session was meant to gather council input on the draft plan 1. The record also said the final draft of the plan would be presented to the City Council for consideration and adoption in October 2025 1. The available records do not establish the meeting's outcome.
- Staff sought feedback on the proposed 2026-2030 Storm and Surface Water Master Plan at the Sept. 9, 2025 City Council study session 1
- No action was requested at the study session; it was held to gather council input on the draft plan 1
- The final draft of the plan was scheduled to be presented to the City Council for consideration and adoption in October 2025 1
Why it matters
A storm and surface water master plan guides how the city manages rainwater runoff and surface water over a set period. The proposed 2026-2030 plan would set Bothell's approach to storm and surface water management for the next five years. Staff sought council feedback on the draft at the Sept. 9 study session, and the final version was scheduled to return for adoption in October 2025 1.
What changed / what's next
- Staff presented a draft 2026-2030 Storm and Surface Water Master Plan for council feedback 1
- The final draft was scheduled for City Council consideration and adoption in October 2025 1
- The final draft of the plan was scheduled to be presented to the City Council for consideration and adoption in October 2025 1
- The available records do not establish the meeting's outcome.