Bothell zoning rules for corner stores, floor area, and lot coverage were scheduled for review

Pre-meeting materials show the Bothell Planning Commission was scheduled to discuss Phase 2 zoning updates tied to the Comprehensive Plan, covering corner stores, floor area ratio, and lot coverage 1.

What the records say

Pre-meeting agenda materials for the Feb. 19, 2025 Bothell Planning Commission meeting listed item 4C as "Phase 2 BMC Updates from Comprehensive Plan" under the study session 1. The accompanying memo says staff were seeking initial feedback on Neighborhood Scale Commercial (sometimes called corner stores), Floor Area Ratio (FAR), and Lot Coverage, and that they planned an administrative cleanup of overlay-zone classifications with no policy change 1. The memo ties the Phase 2 update to the 2024 Imagine Bothell Comprehensive Plan and says staff would return with draft code at a future study session 1. It defines FAR as a standard measurement of allowed square footage based on the underlying buildable area, and lot coverage as the total square footage of a lot covered by impervious surfaces such as building footprints, walkways, driveways, and patios 1. The record is a pre-meeting snapshot; it does not contain the meeting's outcome or any proposed zoning text 1.

  • The Feb. 19, 2025 agenda included a study-session item reading "Phase 2 BMC Updates from Comprehensive Plan" 1.
  • The memo seeks direction on neighborhood-scale commercial (corner stores), floor area ratio, and lot coverage, and also describes an administrative overlay-zone cleanup with no policy change 1.
  • The packet says staff planned to return later with draft code, and it does not record any action taken at the meeting 1.

Why it matters

The scheduled discussion could eventually affect where small shops are allowed in residential neighborhoods, whether FAR remains a regulatory standard, and whether lot coverage limits are replaced by stormwater rules 1. Because the record only establishes that the review was scheduled, residents should regard these as open questions and watch for future draft-code materials and public dockets to see what changes are actually proposed 1.

What changed / what's next

  • A study-session item scheduling Planning Commission review of Phase 2 BMC updates covering corner stores, FAR, and lot coverage appeared on the Feb. 19, 2025 agenda 1.
  • The meeting outcome; the pre-meeting record does not show whether the Planning Commission gave direction or what was discussed 1.
  • Draft code on corner stores, FAR, and lot coverage, which the memo says staff planned to bring back in a later study session 1.
  • The available records do not establish the meeting's outcome.